Rome was not built in one day; nor shall London’s cycling network

What do you think?

Boris Johnson cycle superhighway plans are cut and delayed. While his allies rally round his flagship project, other elements of the London mayor’s “cycling vision” are being quietly dropped or slowed down With media attention firmly focussed on the 18-mile, east-west “Crossrail for bikes” and concerns that this ambitious scheme is being forced through too fast in order to make Boris Johnson look good before he formally steps down in 2016, two of the mayor’s other planned “cycle superhighways” have been dumped and others have been put back. In a written answer to a question from Green Party London Assembly member Darren Johnson, the mayor has confirmed that plans for a superhighway 6 (CS6) from Penge to the City and a superhighway 12 from East Finchley/Muswell Hill to Angel (CS12) “are now deleted from the programme”. Meanwhile, the latest Transport for London (TfL) operational and financial performance report shows that CS11, CS4 and an extension to theforthcoming CS5 are “scheduled to complete later than originally forecast”. Read on here.

Advertisements

About avgivassi

PhD student| MSc Urban Planner| Surveyor Engineer National Technical University of Athens School of Surveying Engineering Sustainable Mobility Unit (SMU)
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s